当前位置:雅思无忧 > 雅思写作 > 正文

雅思A类小作文 School changes 地图类

更新:2022年03月02日 12:28 雅思无忧

雅思考试主要是通过对考生听、说、读、写四个方面英语能力的考核,综合测评考生的英语沟通运用能力,实现“沟通为本”的考试理念。对于雅思考生来说,也有很多考试难点和政策盲区需要帮助解答。今天雅思无忧网小编准备了文章雅思A类小作文 School changes 地图类,希望通过文章来解决雅思考生这方面的疑难问题,敬请关注。
雅思A类小作文 School changes 地图类

You should spend about 20 minutes on this task.

The diagrams below show the changes that have taken place at West Park Secondary School since its construction in 1950.

Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Write at least 150 words.

The diagrams illustrate how West Park Secondary School has developed since 1950 when it was built. Overall, the school saw significant growth although its recreational facilities did not develop as much as its buildings and parking space.

In 1950, the school was a single building located along the main road and to the right of a series of houses. There was a large playground which was located right behind the school building to the right of some farmland.

Thirty years later in 1980, the houses were demolished and replaced by a car park, as well as a new science block, for the school while the old school building was changed into its main building. The farmland was also replaced by a new sports field, but the playground remained unchanged.

In the last year, 2021, the car park was extended, as a result of which the land previously allocated to the sports field was added to it. However, about a third of the old playground was turned into a new, yet much *aller, sports field.

(174 words)

以上就是雅思无忧网为您准备的访问雅思无忧网(https://www.yasi.cn/),了解更多雅思考试新消息,新动态。

雅思培训
免责声明:文章内容来自网络,如有侵权请及时联系删除。
推荐阅读
标签 - 专题
  鲁ICP备18049789号-14

2022雅思无忧网版权所有 All right reserved. 版权所有

警告:未经本网授权不得转载、摘编或利用其它方式使用上述作品